Services in a building act as its backbone. A well-executed project is the one in which all the services as well coordinated with each other and serve the building in the rightful manner. In a hotel project, there are a lot of services involved. And all the services involved are concealed to create the aesthetics in the building
Fire fighting and fire safety services are of utmost prominence in a building. Especially if the building is a public or commercial complex then the highest priority focus should be given to the fire fighting system in the building.
Vaults are the arched structural systems that are used as roofing or ceiling elements. Vaults are usually used in the areas where a self-supported roofing structure is required. The structure of a vault is complex and 3D details for such structures are required for accuracy in execution and prevention of rework.
HVAC in itself is a complex service in a project hence, proper planning and proper detailing is required on site.
For a hotel project, we detailed out the HVAC services. We first calculated the heat load of the building. Once the heat load was calculated, the distribution of water and air for specific rooms was planned.
Fire fighting and fire safety services are of utmost prominence in a building. Especially if the building is a public or commercial complex then the highest priority focus should be given to the fire fighting system in the building.
“A shop drawing is a drawing or a set of drawings produced by the contractor, supplier, manufacturer, subcontractor, or fabricator”
We at VDC develop shop drawings for contractors, suppliers, manufacturers, subcontractors, fabricators, architects, and engineers. For a University project we developed shop drawings on Revit.
3D architecture models are required to understand the architecture details better in a 3D format. Usually such models are made for the contractors.
Each and every architectural detail is added in the 3D model to make it as accurate as possible for future...